Live Nation Jones Beach Amphitheater

Live Nation Jones Beach Amphitheater Sunset

PROJECT DETAILS

Phase 1 of the Live Nation Jones Beach Amphitheater design-assist-build project was completed ahead of the 2023 summer concert season. Phase 2 of the project was carried out throughout the summer.

Since transitioning from the preconstruction phase in early February 2023, the Jones Beach Amphitheater project has seen steady progress. Demolition was carried out in the 3+ acre plaza, VIP areas, and 15 private suites. 3,100 linear feet of custom fencing and walls for work zones inside the theater’s public use areas, waterproofing, and precast joint replacements at the upper bowl seating area were installed. 15 private suites were renovated and 13 open-air suites were added.

The transition from Phase 1 into the summer concert season required construction of 3 work zones contained by 3,100 linear feet of custom fencing and walls. Outside of those walls, concert-goers enjoyed all that the venue had to offer. The EW Howell project team and its subcontractors completed the foundation, underground utilities, and structural slab for Live Nation’s new Box Office building. Foundation and underground utilities for the Member’s Club structure are nearing completion, with a slab pour in September.

LOCATION:

WANTAGH, NY

SECTOR:

ARTS & CULTURE

SCOPE

Design-Assist-Build

MORE PROJECTS

Back To Top